A NSW Government website

A year in the Namoi catchment: 2020–21

Outcomes from the use of water for the environment in 2020–21.

 

The Namoi catchment is located in north-western New South Wales covering an area of about 42,000 square kilometres. It is bordered by the Gwydir and Castlereagh catchments. The major river system is the Namoi River, with tributaries including the Peel and Cockburn rivers and Goonoo Goonoo Creek, with major water storages being Keepit, Split Rock and Chaffey dams.

At the start of the 2020–21 water year, reserves in Keepit and Chaffey dams, although slightly improved, were not enough to provide water allocations to general security licence holders or environmental water accounts. With a moderate outlook of rain, but no water for the environment available, the resource availability scenario for the Namoi and Peel rivers was ‘very dry’. The primary focus for water management was to improve water security for towns and where possible, support native fish.

July to December 2020 saw the Namoi and Peel rivers slowly emerge from drought conditions. General rainfall returned, but the drought-depleted soil profile over the catchment saw modest runoff reach storages. However, natural inflows from the tributaries during this period replenished river pools and refreshed water quality along the length of the lower Namoi River.

Widespread rain between January and June 2021 initiated the start of drought recovery in the Namoi and Peel rivers and tributary inflows serviced ecological water demands.

In April 2021, general security licence holders received a 77% water allocation of their shareholding in the Peel River. This available water determination was made to provide 3850 megalitres of Chaffey Dam Environmental Contingency Allowance and 890 megalitres of Commonwealth Environmental Water Holder (CEWH)-held environmental water.

Key outcomes

Significant outcomes for the 2020–21 water year included:

  • release of 1565 megalitres of Peel Environmental Contingency Allowance (ECA) and CEWH environmental water holdings to support and refresh the Peel River immediately below Chaffey Dam
  • natural tributary flows in the lower Namoi River from January to provide connectivity with the Barwon River and inundate the warrambools, higher floodplains and riparian vegetation along the way
  • connection of the Namoi River with the Barwon River to provide opportunities for native fish, particularly golden perch, to move between these 2 river systems and begin recovery of population numbers.

Water for the environment is available for the 2021–22 water year with Keepit and Chaffey dams at full supply level.

Map showing the Barwon River, Namoi River, Keepit Dam, Chaffey Dam, and other water resources in the region. It highlights selected wetlands, national parks, and state forests, with marked towns such as Walgett, Wee Waa, Narrabri, and Tamworth. The map includes a key for symbols and a scale in kilometers.

Namoi catchment area map

Watering aims

As identified in the Namoi catchment: Annual environmental watering priorities 2020–21, the focus of water managers was to support, where possible, native fish populations through:

  • replenishment of water levels in refuge pools
  • providing opportunities for small-scale movement into new habitat
  • improved water quality in river pools.

With no available water for the environment, this outcome relied on natural flow events in tributaries below Keepit, Split Rock and Chaffey dams. To help guide the sharing of natural flow events, water managers provided advice on critical environmental water needs within the NSW drought management response framework.

When water security improved in the Namoi and Peel rivers, environmental flows were used to continue drought recovery.

In autumn, a portion of water for the environment was used to provide a base flow along the 7.5-kilometre length of the Peel River between Chaffey Dam and Woolomin village. The aim of this release was to increase access to food and habitat and improve the health of native fish and riverine mammals, such as platypus and rakali (native water rat), and enhance opportunities for successful breeding in spring.  

Water delivery

This bar chart and table provide a summary of 1565 megalitres of environmental water delivered in the Namoi catchment during the 2020–21 watering year. Volumes are indicative only. The watering event number on the bar chart and in the table relates to the location number marked on the map.

Bar chart showing water delivery to the Namoi catchment in the 2020-21 water year.

Bar chart showing water delivery to the Namoi catchment in the 2020–21 water year.

Notes: CEW = Commonwealth licensed environmental water; EWA = Environmental water allowance

Summary of environmental water delivered in the Namoi catchment during 2020–21
Watering event numberLocationOutcomesStart dateFinish date
1Peel Environmental Contingency AllowanceNative fish24 May 202103 Jun 2021

Outcomes

The Department of Planning, Industry and Environment, in collaboration with the Department of Primary Industries – Fisheries identified the 7.5-kilometre section of the Peel River immediately downstream of Chaffey Dam to have significant drought refuge value. The absence of base flows and fresh flows in the river for more than 18 months had reduced the availability of food and habitat.

This section is the only refuge in the regulated Peel River that can be supported during prolonged droughts. The limited water available for environmental use during droughts highlights the value of this section of the river for refuge and system recovery. This section of the river supports platypus, rakali (native water rat), turtles and threatened fish species such as silver perch and Murray cod. It also supports other native fish species such as gudgeons, Australian smelt and river blackfish.

A total of 1565 megalitres of water for the environment was released in autumn over a period of 17 days. The joint release with the Commonwealth Environmental Water Holder (CEWH) used 1170 megalitres of Chaffey Dam planned Environmental Contingency Allowance and 395 megalitres of CEWH general security entitlement. This volume represented approximately 31% of the available water for the environment for the 2020–21 water year.

The managed release allowed native fish and platypus to move throughout the river system and find more suitable habitat, including deeper pools, logs and vegetation. The flow improved riverine productivity by flushing carbon and other nutrients off low in-channel sediment bars. This much needed flow replenished food supplies and helped improve the health and condition of native fish before winter. The healthier native fish are when they emerge from winter, the more likely they are to successfully breed during spring.

An improvement in dissolved oxygen levels was also recorded in the largest refuge pool in the regulated Peel River located immediately below Chaffey Dam.

Case study: Chaffey Dam to Dungowan water supply pipeline Stage 2

After years of drought and cease-to-flow conditions in the Peel River downstream of Chaffey Dam, the river had retreated to a series of disconnected pools.

As a drought response to secure town water supply for Tamworth, the minimum daily flow rule from Chaffey Dam had been suspended since November 2019 and authorisation given to WaterNSW to deliver water to Tamworth via a pipeline. This authorisation was subject to conditions that:

  • allow the pipeline to be used when Chaffey Dam storage is less than 20% of full supply capacity. When the dam is below this threshold, water can be supplied to Tamworth Regional Council using the pipeline and releases from Chaffey Dam into the Peel River cease.
  • establish a small volume of water accrued daily as an Environmental Contingency Allowance to support habitat for fish and platypus when releases stop from Chaffey Dam. This allowance volume was managed by the Peel Environmental Water Technical Advisory Group.

Using expert and local knowledge, the Peel Environmental Water Technical Advisory Group recommended release of the available accrued 61.5 megalitres over 4 days from 30 July 2020 to reconnect pools. The release was successful. It restored flow along the 7.5-kilometre section of river and replenished river pools that provided important drought refuge for local populations of platypus, rakali, turtles and threatened fish species such as silver perch and Murray cod.

Dry riverbed of Peel River with cracked mud and scattered rocks, surrounded by green vegetation under a clear sky, indicating a period of drought before environmental water flow restoration.

Peel River before environmental water flow.

Peel River during an environmental water flow event, with clear, flowing water reflecting light and surrounded by dense greenery, including trees and shrubs. The riverbanks gently slope into the water, and several rocks are scattered within the riverbed, around which the water flows smoothly.

Peel River during environmental water flow.